| 1. | Pressure taps should be sufficiently large . 测压孔应该足够大。 |
| 2. | To prevent clogging of the pressure tap by fine solids gas is bled into the bed at low velocity at the taps . 为了防止测压管嘴被微细颗粒堵塞,在管嘴处以低流速向床内注入气体。 |
| 3. | Industrial valves . drain hoss or pressure tap 工业阀门.加压和卸压的加厚部件 |
| 4. | Hydraulic fluid power . screw in pressure tapping , pn 400 and pn 630 液压流体动力. pn 400和pn 630压力攻丝螺钉 |
| 5. | Static pressure tapping 静压取压孔 |
| 6. | Total pressure tapping 总压取压孔 |
| 7. | Wall pressure tapping 管壁取压口 |
| 8. | Pressure tapping points on either side of the seat provide the means for flow measurement 阀座两侧的测压点提供流量测量的方法。 |
| 9. | Flow measurement ; differential pressure devices with corner taps ; length of pressure taps stud and installation dimensions for determination of space required 流量测量.带弯测压接嘴的压差装置.测压接嘴螺柱的长 |
| 10. | Cut out insulation around pressure taps so that when diagnostic checks are required , plugs are visible when outside shell is removed as shown in fig . 3 当需要进行诊断检测时,切开环绕测压孔周围的保温材料,使得外壳拆卸后能够看到塞子,如图3所示。 |